Zarqa College and phosphate interchange-Amman Zarqa Highway - Marwan Al Kurdi

Zarqa College and phosphate interchange-Amman Zarqa Highway

The new re-design of the 2 separate bridges was very successful to reduce the time required for opening the road to traffic and to addi two additional lanes to be 4 lanes instead of 2. The scope of work also included earth work, asphalt works, slope protection and Reinforced Soil Walls of geogrid type. The purpose of the project was to solve the traffic jam problem on the most congested highway in Jordan. Construction of traffic detours was essential in order not to disrupt the traffic flow during construction.